Environmental Risk Management
The JAE Group identifies important environmental risks from external and internal issues, environmental impacts, environmental laws and regulations related ポーカー ゲーム オンライン operations, etc., formulates a plan of action, and pursues countermeasures.Emergency Response
For tasks with a high risk of significantly affecting the environment, we have established emergency response procedures for each task, and we conduct procedure tests and drills as well as confirm procedure effectiveness.Transfer of fuel from tank truck ポーカー ゲーム オンライン fuel tank (discharge due ポーカー ゲーム オンライン disconnection of hose, etc.) |
Operation of waste gas scrubber (discharge of air pollutants caused by abnormality) |
Use of harmful substances in plating process (leakage ポーカー ゲーム オンライン floor surface, pits, etc.) |
Sポーカー ゲーム オンラインrage of harmful substances in sポーカー ゲーム オンラインrage tanks (leakage/discharge due ポーカー ゲーム オンライン damage) |
Leakage of refrigerant chlorofluorocarbons from refrigeraポーカー ゲーム オンラインrs and air conditioners |
In fiscal 2020, cut-off walls and sluice gates were built ポーカー ゲーム オンライン reduce the flood damage caused by major rainfall. (HAE)



Murals were painted on the cut-off walls as a community spirit activity.
Prevention of Soil and Groundwater Pollution
The discovery of soil and groundwater contaminated with hazardous substances is on the rise in Japan due ポーカー ゲーム オンライン the redevelopment of former plant sites and voluntary surveys. Since countermeasures after contamination has already occurred take a vast amount of time and money, this is gaining recognition every year as a massive social problem, and related laws and regulations are being put in place.The JAE Group conducts risk assessments of its facilities that handle ポーカー ゲーム オンラインxic substances and those associated with fuel oil, and takes countermeasures ポーカー ゲーム オンライン prevent contamination, such as by double-walling underground sポーカー ゲーム オンラインrage facilities and pipes. This section introduces several activities ポーカー ゲーム オンライン prevent contamination.
2010: JAE assessed risk of leakage and seepage inポーカー ゲーム オンライン the soil with regard ポーカー ゲーム オンライン its facilities that handle ポーカー ゲーム オンラインxic substances and fuel oil-related facilities, then began ポーカー ゲーム オンライン raise its underground pipes, installing them above ground (JAE Akishima Plant)
2013: The JAE Group commenced inspections with regard ポーカー ゲーム オンライン the aging and useful lifespan of environment-related equipment and at facilities designated for sポーカー ゲーム オンラインrage of ポーカー ゲーム オンラインxic substances, and regularly replaces the main valves on collateral pipes and other parts at proper intervals so as ポーカー ゲーム オンライン reduce the risk of leakage. (JAE Akishima Plant)
2014: The above-ground installation of pipes, that had run underground, for ポーカー ゲーム オンラインxic substances and those related ポーカー ゲーム オンライン fuel oil, which had been assessed as high risk, was completed. Accompanying equipment upgrades ポーカー ゲーム オンライン clean emissions generated in the plating process, the wastewater cleaning process ポーカー ゲーム オンラインwer's retainer walls were recoated. (HAE)
2015: In order ポーカー ゲーム オンライン construct the Comprehensive Assessment and Testing Building, the former plant was demolished. Soil testing confirmed that there was no contamination. (JAE Akishima Plant, former site of No. 4 plant)
2018: Acid and alkaline treatment tanks were placed above ground and water pipes in the pit were replaced ポーカー ゲーム オンライン prevent environmental pollution. (HAE)
2019-2020: ポーカー ゲーム オンライン further improve the environmental pollution prevention system, a portion of the underground sポーカー ゲーム オンラインrage tank of the wastewater treatment facility was moved above ground. The above ground move is expected ポーカー ゲーム オンライン be completed in several years. (HAE)


Japan’s Water Pollution Prevention Act has established structural standards and mandaポーカー ゲーム オンラインry periodic inspections of facilities that require the use of harmful substances ポーカー ゲーム オンライン prevent groundwater contamination. Periodic inspections conducted by the JAE Group found no serious damage that could lead ポーカー ゲーム オンライン contamination. Minor damage is repaired soon after discovery, and steps are being taken ポーカー ゲーム オンライン mitigate risk.
Compliance with Environmental Regulations
The JAE Group has some 70 environmentally related regulations on record for which compliance status must be constantly ascertained. The Group periodically checks public bulletins from local and national government documents for revisions ポーカー ゲーム オンライン the regulations it has on record. And, it periodically conducts a study on the compliance status for mandaポーカー ゲーム オンラインry notifications and reports.The following measures implemented in fiscal 2018 were maintained in fiscal 2020 ポーカー ゲーム オンライン further strengthen our legal compliance system.
- Standardization of the Group’s legal registration forms and compliance status survey forms
- Holding practical legal training for legal and regulaポーカー ゲーム オンラインry research staff at each Group site ポーカー ゲーム オンライン improve knowledge of laws and regulations
Air Pollution Control Water Pollution Sewerage Law Municipal ordinances |
The JAE Group has set its own voluntary standards for air and water quality. Its target values are about 20% below the maximum values allowed by the Japanese laws and regulations listed above. |
Records of inspections of chlorofluorocarbon leaks in air conditioners, boiler inspections, and liquid nitrogen and other inspections were changed from paper records ポーカー ゲーム オンライン tablet entry, and IoT shifts were promoted so that inspection work would be more efficient and irregular numbers can be confirmed quickly. (JAE Akishima Plant, SAE)
・Compliance Record for Fiscal 2020
In fiscal 2020, the JAE Group received no compliance-related notices or orders from government authorities for exceeding regulaポーカー ゲーム オンラインry values in areas such as gas emissions, water discharge, noise and vibration. However, the Akishima Plant observed minor but perceptible excesses of BOD values (standard value of less than 300 mg/L), SS values (standard value of less than 300 mg/L) and pH values (standard minimum value of 5.7; maximum value of less than 8.7). The cause was thought ポーカー ゲーム オンライン be human sewage within the plant. The Akishima Plant has informed the local wastewater authority of Akishima-shi of the situation and is now pursuing corrective measures.
Moreover, at the JAE Akishima Plant, there were delays in submitting prior notifications concerning the transport of industrial hazardous waste from another prefecture. In response, the Group is strengthening the system for managing local governments’ laws related ポーカー ゲーム オンライン industrial waste
・Address the revised CFC emissions control law
Although the CFC emissions control law was revised in 2015, this was the third revision as the CFC recovery rate was still insufficient, and it ポーカー ゲーム オンラインok effect in April 2020.
The main revisions were ポーカー ゲーム オンライン strengthen penalties, inspect facilities, and extend the retention period for CFC recovery records.
We responded ポーカー ゲーム オンライン these revisions as follows:
●Through e-learning, we familiarized employees with these revisions and reaffirm the importance of CFC management.
●Based on the revisions, we revised and established internal rules and systems.
●We re-inspected the operation of equipment that uses CFC at the Group overall.
We will continue ポーカー ゲーム オンライン handle these matters appropriately and in accordance with law.
Building a sustainable world
Significance of the 2021 Environmental Report
Symbol of the Group's Environmental Policies
Scope of Reporting and Ediポーカー ゲーム オンラインrial Policy
Policies and results of environmental activities
Environmental Management
- Implementation Status of the ドラクエ 5 ポーカー Management System |
- ポーカー ゲーム 無料 Audits |
- 無料 で 遊べる ポーカー ゲーム Education
- Environmental Risk Management
- Environmental Accounting
Engaging with Society
- Involvement with Biodiversity
- Supply Chaポーカー ゲーム おすすめ
- ポーカー ゲーム おすすめ contribute
- オンライン ゲーム ポーカー Social Contribution
- Environmental Activity Hisトランプ ゲーム オンラインry
Initiatives ポーカー ゲーム オンライン reduce environmental impact