Group Sites (Japan/Overseas)
- Return
- 17 / 17
ポーカー の やり方 Activity History
1960s | 1961(April) |
Completed plant (present day JAE Akishima Plant) in beautiful, green Akishima Installed plating wastewater processing system |
---|---|---|
1970s | 1970 |
Established Pollution Countermeasures HQ |
1973 |
Installed integrated sewage treatment system (JAE Akishima Plant) |
|
1976 |
Launched ポーカー の やり方 Safety Management Center (JAE Akishima Plant) Established ポーカー の やり方 Safety Assessment Committee Implemented rationalization measures for rinse water according to groundwater pumping regulations, etc. (water conservation) |
|
1980s | 1983 |
Established a register of chemical substances used in Akishima region |
1984 |
Commenced discharge of plating wastewater and sewage after completion of sewer system in Akishima-shi (JAE Akishima Plant) |
|
1989 |
Established CFC Countermeasure Committee |
|
1990s | 1990 |
Launched ポーカー の やり方 Management Division (JAE Akishima Plant) Established ポーカー の やり方 Management Committee rules Established rules for preventing and controlling air pollution Established rules relating to preventing pollution |
1991 |
Started campaign to use less paper and recover used paper Launched ポーカー の やり方 Measure Assembly for JAE subsidiaries Commenced use of recycled paper companywide |
|
1993 |
Established JAE ポーカー の やり方 Charter (present day ポーカー の やり方 Policy of the JAE Group) |
|
1994 |
Established Action Plan for ポーカー の やり方 Management at JAE Commenced ポーカー の やり方 auditing |
|
1995 |
Established product assessment guidelines Commenced control and ordering management for poisonous and deleterious chemical substances |
|
1996 |
Launched Preparatory Committee for Acquiring ISO 14001 Certification |
|
1998 |
ISO 14001 certification acquired at Akishima Plant |
|
1999 |
Commenced lead-free activities |
|
2000s | 2000 |
Completed acquisition of ISO 14001 certification at four domestic production subsidiaries Commenced activities for reducing use of materials that cause global warming Merged ポーカー の やり方 Management Division th Production Support and ポーカー の やり方 Planning Division Commenced zero emissions activities |
2001 |
ISO 14001 certification acquired by JAE Taiwan, Ltd. Commenced green purchasing and green procurement activities |
|
2002 |
Commenced activities for reducing paper usage ISO 14001 certification acquired by JAE Wuxi Co., Ltd. |
|
2003 |
ISO 14001 certification acquired by JAE Philippines, Inc. ISO 14001 certification acquired by JAE Oregon, Inc. ISO 14001 certification acquired by JAE Wujiang Co., Ltd. |
|
2004 |
Established ポーカー の やり方 Advisor system Established JAE Group Forest ISO 14001 certification acquired by JAE Hong Kong, Ltd. |
|
2005 |
ISO 14001 certification at Japanese group companies switched to multi-site system |
|
2006 |
Completed overhaul of pipeline carrying fluorine waste fluid (JAE Akishima Plant) |
|
2008 |
Commenced REACH-Compliance WG activities in January |
- Return
- 17 / 17