1960 | 1961(April) |
Completed plant (present-day JAE Akishima Plant) in beautiful, green Akishima Installed plating wastewater processing system |
---|---|---|
1970 | 1970 |
Established Pollution Countermeasures HQ |
1973 |
Installed integrated sewage treatment system (JAE Akishima Plant) |
|
1976 |
Launched ディーラー ポーカー Safety Management Center (JAE Akishima Plant) Established ディーラー ポーカー Safety Assessment Committee Implemented rationalization measures for rinse water according to groundwater pumping regulations, etc. (water conservation) |
|
1980 | 1983 |
Established a register of chemical substances used in Akishima region |
1984 |
Commenced discharge of plating wastewater and sewage after completion of sewer system in Akishima-shi (JAE Akishima Plant) |
|
1989 |
Established CFC Countermeasure Committee |
|
1990 | 1990 |
Launched ディーラー ポーカー Management Division (JAE Akishima Plant) Established ディーラー ポーカー Management Committee rules Established rules for preventing and controlling air pollution Established rules relating to preventing pollution |
1991 |
Started campaign to use less paper and recover used paper Launched ディーラー ポーカー Measure Assembly for JAE subsidiaries Commenced use of recycled paper companywide |
|
1993 |
Established JAE ディーラー ポーカー Charter (present-day ディーラー ポーカー Policy of the JAE Group) |
|
1994 |
Commenced ディーラー ポーカー auditing |
|
1995 |
Established product assessment guidelines Commenced control and ordering management for poisonous and deleterious chemical substances |
|
1998 |
ISO 14001 certification acquired at Akishima Plant |
|
1999 |
Commenced lead-free activities |
|
2000 | 2000 |
Completed acquisition of ISO 14001 certification at four domestic production subsidiaries Commenced activities for reducing use of materials that cause global warming Merged ディーラー ポーカー Management Division with Production Support and ディーラー ポーカー Planning Division Commenced zero emissions activities |
2001 |
ISO 14001 certification acquired by JAE Taiwan, Ltd. Commenced green purchasing and green procurement activities |
|
2002 |
Commenced activities for reducing paper usage ISO 14001 certification acquired by JAE Wuxi Co., Ltd. |
|
2003 |
ISO 14001 certification acquired by JAE Philippines, Inc. ISO 14001 certification acquired by JAE Oregon, Inc. ISO 14001 certification acquired by JAE Wujiang Co., Ltd. |
|
2004 |
Established ディーラー ポーカー Advisor System Established JAE Group Forest ISO 14001 certification acquired by JAE Hong Kong, Ltd. |
|
2005 |
ISO 14001 certification at Japanese group companies switched to multi-site system |
|
2006 |
Completed overhaul of pipeline carrying fluorine waste fluid (JAE Akishima Plant) |
|
2008 |
Commenced REACH-Compliance WG activities |
|
2009 |
Commenced No-Driving Day program at Akishima Plant |
|
2010 | 2010 |
Formulated the Ten-Point Plan for Saving Energy |
2011 |
ISO 14001 certification acquired by JAE Tijuana, S.A. de C.V. |
|
2012 |
Completion of the switch to 100% electronic manifests at the Akishima Plant |
|
2013 |
Each Group company in Japan maintains 100% of its industrial waste manifests in electronic format. |
|
2014 |
Event commemorating the 10thanniversary of the JAE Group Forest, the symbol of the Group's ディーラー ポーカー policies |
|
2015 |
Upon reaching a 99.8% recycling rate, the zero emissions goal for waste was raised from "over 99%" to "over 99.5%." |