Top of the Page

Link to Site Map
Go to the Text ( c )

The main part starts from here.

テキサス ホールデム 確率 Group Sites

Environmental Activity History

1960 1961 (April)

Completed plant (present day ポーカー 無料 オンライン Akishima Plant) in beautiful, green Akishima

Installed plating wastewater processing system

1970 1970

Established Pollution Countermeasures HQ

1973

Installed integrated sewage treatment system (ポーカー 無料 オンライン Akishima Plant)

1976

Launched Environmental Safety Management Center (ポーカー 無料 オンライン Akishima Plant)

Established Environmental Safety Assessment Committee

Implemented rationalization measures for rinse water according to groundwater pumping regulations, etc. (water conservation)

1980 1983

Established a register of chemical substances used in Akishima region

1984

Commenced discharge of plating wastewater and sewage after completion of sewer system in Akishima-shi (ポーカー 無料 オンライン Akishima Plant)

1989

Established CFC Countermeasure Committee

1990 1990

Launched Environmental Management Division (ポーカー 無料 オンライン Akishima Plant)

Established Environmental Management Committee rules

Established rules for preventing and controlling air pollution

Established rules relating to preventing pollution

1991

Started campaign to use less paper and recover used paper

Launched Environmental Measure Assembly for ポーカー 無料 オンライン subsidiaries

Commenced use of recycled paper companywide

1993

Established ポーカー 無料 オンライン Environmental Charter (present day Environmental Policy of the ポーカー 無料 オンライン Group)

1994

Established Action Plan for Environmental Management at ポーカー 無料 オンライン

Commenced environmental auditing

1995

Established product assessment guidelines

Commenced control and ordering management for poisonous and deleterious chemical substances

1996

Launched Preparatory Committee for Acquiring ISO 14001 Certification

1998

ISO 14001 certification acquired at Akishima Plant

1999

Commenced lead-free activities

2000 2000

Completed acquisition of ISO 14001 certification at four domestic production subsidiaries

Commenced activities for reducing use of materials that cause global warming

Merged Environmental Management Division with Production Support and Environmental Planning Division

Commenced zero emissions activities

2001

ISO 14001 certification acquired by ポーカー 無料 オンライン Taiwan, Ltd.

Commenced green purchasing and green procurement activities

2002

Commenced activities for reducing paper usage

ISO 14001 certification acquired by ポーカー 無料 オンライン Wuxi Co., Ltd.

2003

ISO 14001 certification acquired by ポーカー 無料 オンライン Philippines, Inc.

ISO 14001 certification acquired by ポーカー 無料 オンライン Oregon, Inc.

ISO 14001 certification acquired by ポーカー 無料 オンライン Wujiang Co., Ltd.

2004

Established Environmental Advisor system

Established ポーカー 無料 オンライン Group Forest

ISO 14001 certification acquired by ポーカー 無料 オンライン Hong Kong, Ltd.

2005

ISO 14001 certification at Japanese group companies switched to multi-site system

2006

Completed overhaul of pipeline carrying fluorine waste fluid (ポーカー 無料 オンライン Akishima Plant)

2008

Commenced REACH-Compliance WG activities in January

2009

Commenced no-car day program at Akishima Plant

2010 2010

Formulated the Ten-Point Plan for Saving Energy

2011

ISO14001 certification acquired by ポーカー 無料 オンライン Tijuana, S.A. de C.V.